Comment
Author: Admin | 2025-04-28
Bit Membership Background for the promotion of bit membership Infrastructure in the Middle East Building Blockchain Recently, Korean blockchain companies participated in the construction of blockchain infrastructure involving Saudi Arabia, Bahrain, the United Arab Emirates (Dubai), Japan, and Korea, creating conditions for establishing a Bitcoin mining data center in Bahrain.Bahraini authorities promised to secure the first 30,000 pyeong site and supply stable power, and Bitmain's new contract for ASIC mining equipment (water-cooled) through a supply of 40 billion won led to a preemptive setting. Bitcoin 4th round half-life changes in the mining environment Recently, Korean blockchain companies participated in the construction of blockchain infrastructure involving Saudi Arabia, Bahrain, the United Arab Emirates (Dubai), Japan, and Korea, creating conditions for establishing a Bitcoin mining data center in Bahrain.Bahraini authorities promised to secure the first 30,000 pyeong site and supply stable power, and Bitmain's new contract for ASIC mining equipment (water-cooled) through a supply of 40 billion won led to a preemptive setting. Bitcoin 4th round half-life changes in the mining environment In line with the adjustment of difficulty after the half-life of Bitcoin and the replacement of mining equipment, the hesitancy of new investments with the half-life trend of companies operating old mining equipment in mind could be an opportunity, and the idea that sufficient profitability can be secured for the rising value of Bitcoin, which currently exceeds 100 million won, came to the idea of a global bitcoin membership business. BTC water-cooled mining equipment from the latest Bitmain company Affordable electricity cost about 150-190 won in Korea, about 25-30 won in Bahrain - Approximately 7 to 8 times cheaper than Korea (reduced by about 8 percent) Installation of water-cooled ASIC a mining machine of the highest/latest specifications Best a mining machine for the Middle East (sand wind, bottled water supply, containers), Installation and management by Bitmain's professionals (Bahrain, UAE, Saudi Arabia) Approximately 700,000 to 1 million older mining machines operating around the world after halving are expected to be eliminated - BTC price rise expectations (up after 6 months of past halving / peak after 12-18 months) - Monthly return on mining machine investment compared to current price is expected to increase by 4% to 5%, and prices are expected to rise in the future BTC Halving Arrived Installation of water-cooled ASIC a mining machine of the highest/latest specifications Best a mining machine for the Middle East (sand wind, bottled water supply, containers), Installation and management by Bitmain's professionals (Bahrain, UAE, Saudi Arabia)
Add Comment