Jv crypto

Comment

Author: Admin | 2025-04-27

Restructuring and growth initiatives in the coming months.”March 2024February 2024Total energy capacity under management1884 MW926 MWTotal deployed miners under management2,3241.6K258.2KTotal hashrate under management2,425.5 EH/s27.0 EH/s Self-Mining5 Deployed miners2,655.0K74.1KDeployed hashrate2,75.4 EH/s7.2 EH/sBitcoin produced8231 BTC292 BTCBitcoin on balance sheet99,102 BTC9,110 BTC Managed Services10 Energy capacity under management767 MW767 MWDeployed miners under management2,11210.5K218.6KHashrate under management222.6 EH/s23.4 EH/s Hosting Deployed miners under management2,11,1276.8K76.7KHashrate under management2,138.7 EH/s8.7 EH/sNotes:1 Includes all Self-Mining, Managed Services, and Hosting infrastructure, including 100% of the energy capacity at the King Mountain site, which is owned by the King Mountain JV in which the Company has a 50% membership interest and a Fortune 200 renewable energy producer has the remaining 50% membership interest (the “King Mountain JV”).2 Average during the period for March 2024.3 Includes all miners that are racked with power and networking, rounded to the nearest 100, in Self-Mining, Managed Services, and Hosting infrastructure with power and networking, including all miners at the King Mountain site.4 Includes all Self-Mining, Managed Services, and Hosting hashrate, including 100% of the hashrate at the King Mountain site.5 Self-Mining operations for Hut 8 include 100% of operations at the King Mountain site.6 Deployed miners are defined as those physically racked with power and networking, rounded to the nearest 100; deployed self-mining miners net of the 50% share of the King Mountain JV held by Hut 8’s joint venture partner was 46.1K during March and 65.1K during February.7 Indicates the target hashrate of all deployed miners; deployed self-mining hashrate net of the 50% share of the King Mountain JV held by Hut 8’s joint venture partner was 4.5 EH/s during March and 6.3 EH/s during February.8 Bitcoin produced net of the 50% share of the King Mountain JV held by Hut 8’s joint venture partner was 192 BTC during March and 254 during February.9

Add Comment